Job2Build
Find tradespeopleHow it worksFor customersFor tradespeopleTrust & safetyPricing
Job2Build

The UK's trust-first marketplace connecting customers with skilled tradespeople.

Platform

  • Find Jobs
  • Find Tradespeople
  • All Trades
  • For Customers
  • For Tradespeople
  • Trust & Safety
  • Guides
  • Q&A
  • How It Works
  • Pricing

Locations

  • London
  • Manchester
  • Birmingham

Company

  • About
  • Blog
  • Careers
  • Contact

Legal

  • Privacy Policy
  • Terms of Service
  • Cookie Policy

© 2026 Job2Build Ltd. All rights reserved.

Registered in England & Wales

Delivery Planning Hub

Service timeline planning

Set realistic delivery expectations before procurement so quotes can be compared on timing as well as price.

Timeline routes by service

14 timeline pages with local city rollout continuity.

Boiler Repair

Typical timeline: Same day for small repairs, 1–2 days for a boiler swap, 1–2 weeks for a full heating system

Open timeline planner

Boiler Installation

Typical timeline: Same day for small repairs, 1–2 days for a boiler swap, 1–2 weeks for a full heating system

Open timeline planner

Boiler Replacement

Typical timeline: Same day for small repairs, 1–2 days for a boiler swap, 1–2 weeks for a full heating system

Open timeline planner

Consumer Unit Replacement

Typical timeline: 1–2 days for small jobs, 5–10 days for a full house rewire

Open timeline planner

House Rewiring

Typical timeline: 1–2 days for small jobs, 5–10 days for a full house rewire

Open timeline planner

Electrical Inspection

Typical timeline: 1–2 days for small jobs, 5–10 days for a full house rewire

Open timeline planner

Bathroom Installation

Typical timeline: 1–2 weeks for standard bathroom replacements, 2–3 weeks for complex layouts or wet-room builds

Open timeline planner

Kitchen Installation

Typical timeline: 2–4 weeks for most kitchen installations, longer when structural or utility changes are required

Open timeline planner

Roof Repair

Typical timeline: 1–2 days for repairs, 1–2 weeks for a full re-roof, 1 day per window for replacements

Open timeline planner

Roof Replacement

Typical timeline: 1–2 days for repairs, 1–2 weeks for a full re-roof, 1 day per window for replacements

Open timeline planner

Flat Roof Repair

Typical timeline: 1–2 days for repairs, 1–2 weeks for a full re-roof, 1 day per window for replacements

Open timeline planner

Drain Unblocking

Typical timeline: Same day for small repairs, 1–2 days for a boiler swap, 1–2 weeks for a full heating system

Open timeline planner

House Extension

Typical timeline: 2–4 weeks for small projects, 3–6 months for extensions and conversions

Open timeline planner

Loft Conversion

Typical timeline: 2–4 weeks for small projects, 3–6 months for extensions and conversions

Open timeline planner