Ask for excavation depths, sub-base build-up, drainage assumptions, and spoil removal in writing.
£500–£2,000 for fencing, £2,000–£6,000 for a patio, £3,000–£10,000+ for a full driveway
This is the UK guide range. Final quotes in Wokingham vary based on demand, access, parking/logistics, property type, and service scope.
Typical timeline: 1–3 days for fencing, 3–5 days for a patio, 1–2 weeks for a full driveway or garden redesign
Find vetted patio specialist specialists and contractor profiles in Wokingham
Browse all local specialist and contractor pathways in Wokingham
Wokingham's family houses, villages, and high commuter demand often lead to extensions, lofts, landscaping, and premium kitchen or bathroom upgrades.
Keep local quotes comparable by fixing the same scope, quality threshold, and access assumptions before you let providers price the job.
Ask for excavation depths, sub-base build-up, drainage assumptions, and spoil removal in writing.
Confirm whether plants, turf, lighting, and irrigation are included or listed as optional extras.
Get the exact paving, timber, or fencing specification so cheaper quotes are not using thinner materials.
Request weather allowances and maintenance handover details before appointing a landscaper.
Local availability and logistics can make weak quotes look persuasive. Push these risks into writing before you approve the shortlist.
No written detail on excavation depth, sub-base, drainage, or spoil disposal.
Material descriptions that stay vague on thickness, grade, or treatment level.
Large deposits requested before measurements, levels, or boundary assumptions are agreed.
Claims that weather and access constraints 'won't affect price' on exposed external work.
If the driveway is over 5 square metres and uses impermeable materials (block paving without drainage, solid tarmac), you may need planning permission. Using permeable paving or including soakaway drainage avoids this requirement.
Quality block paving typically lasts 25–30+ years with proper installation and drainage. Over time, joints may need re-sanding and weeds managed, but the blocks themselves are very durable.
If a tree is protected by a Tree Preservation Order (TPO) or is in a conservation area, you must get permission from your local council before any pruning or removal. Removing a protected tree without consent can result in significant fines.
Gravel is the most affordable option at £20–£40 per square metre installed. Tarmac costs £40–£70/m², block paving £60–£100/m², and resin-bound surfacing £50–£80/m². The right choice depends on appearance, durability, and drainage requirements.
Compare local context before requesting quotes.