£4,500–£12,000 for most full bathroom installations, £12,000+ for premium layouts and structural alterations
Pricing varies by property type, service requirements, and location. Always compare at least 3 like-for-like quotes before appointing.
Typical timeline: 1–2 weeks for standard bathroom replacements, 2–3 weeks for complex layouts or wet-room builds
Ask for recent bathroom-only projects, not generic kitchen portfolios
Confirm who is handling plumbing, waterproofing, and any electrical coordination
Check they provide a clear strip-out, install, and snagging schedule
Verify finish quality standards for tiling lines, sealant detail, and fixture alignment
Insist on an itemised quote covering fixtures, labour, and making-good work
Emergency callouts, evening/weekend visits, and urgent parts sourcing usually increase rates. If your job is non-urgent, planning ahead and combining smaller tasks into one visit often reduces total spend.
Explore local cost context before requesting quotes.
Most full bathroom installations take 1-2 weeks. Complex changes such as layout reconfiguration, wet-room tanking, or major pipe relocation can extend timelines to 2-3 weeks.
Usually not for part of the project. If it is your only bathroom, discuss phased access and temporary arrangements with your fitter before work starts.
Tile specification, fixture quality, drainage changes, waterproofing requirements, and hidden remedial works are usually the biggest cost drivers.
A quality bathroom fitter should plan both. Proper tanking, extraction, and moisture control are essential to avoid mould, leaks, and premature finish failure.